Application: | Dumpling, Samosa, Dumpling, Spring Roll Wrapper |
---|---|
Voltage: | 380V |
Certification: | ISO, CE |
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Model | LGCJ-3620 | LGCJ-5029 | LGCJ-8045 | LGCJ-12060 | LGCJ-12060II |
Power(3 Phase) | 380V 50HZ/60HZ | 380V 50HZ/60HZ | 380V 50HZ/60HZ | 380V 50HZ/60HZ | 380V 50HZ/60HZ |
Dia. Of Heating Cylinder(MM) |
400 | 500 | 800 | 1200 | 1200 |
Electric Power(KW) | 6kw or Gas | 13kw or Gas | 38kw or Gas | 59kw or Gas | 120kw or Gas |
Host Power(KW) | 0.75 | 0.75 | 0.75 | 0.75 | 0.75 |
Cutter Power(KW) | 0.2 | 0.2 | 0.2 | ||
Belt Power(KW) | 0.55 | 0.55 | 0.55 | 0.55 | 0.55 |
Pump Power(kw) | 1.5 | 1.5 | |||
Production Capacity (Pcs/H) |
500-1000 | 1000-1500 | 3000-4500 | 4500-7000 | 12000 |
Machine Size(MM) | 1950*800*1200 | 2150*950*1350 | 2600*1100*1600 | 3300*1500*2200 | 3300*2700*2300 |
Host Speed(Turn/Min) | 1-2.5 | 1-2.5 | 2-3 | 2-3 | 43499 |
Machine Weight(KG) | 330 | 520 | 1000 | 1250 | 3500 |
Size Of The Sheet (Max.)(MM) |
200 | 290 | 450 | 600 | 600 |
Thickness Of Sheet(MM) |
0.3-2.0 | 0.3-2.0 | 0.3-2.0 | 0.3-2.0 | 0.3-2.0 |
Remark: This date is reference for 15 cm,specific output is based on the actual size. |
Pre-sale services | Services during the sale | After-sale services |
24 hours online,by mail or on online chatting. | Pre-check and accept products ahead of delivery | Quality guarantee term is for one year,but we will provide the life-long after-sale service for clients-self. |
professionally recommend the suitable machine. | Help clients to draft solving plans. | Assist clients to prepare for the first construction scheme |
Design and manufacture products according to clients' special requirement; | Ship it with help of experienced shipping line,update the shipping time and arrival time. | Install and debug the equipment |
Visit the factory | Accept multiple terms of payment | Train the first-line operators |
Suppliers with verified business licenses